Independent data centre consultancy

Engineering certainty for mission-critical investment.

Senior-led advisory, engineering design and delivery assurance for data centre investors, operators and developers across Vietnam and APAC.

Since 2007Vietnam-based delivery
500 MWPlanned utility-load campus
Director-ledEngineering & delivery assurance
Full lifecycleFeasibility to handover
Supporting

Hyperscalers

Colocation developers

Cloud & AI operators

Infrastructure funds

Local developers

Who we are

Global mission-critical standards. Grounded Vietnam execution.

ENGCORP International is an independent data centre construction consultancy and engineering design firm headquartered in Ho Chi Minh City, supporting investors, developers and operators across Vietnam and the wider Asia-Pacific region.

We combine international mission-critical experience with practical knowledge of Vietnam’s regulatory, utility, construction and commercial environment. Our role is to translate investor and operator requirements into facilities that are technically robust, locally approvable, buildable, maintainable and ready to commission and operate.

Our services extend across the full project lifecycle—from market entry, site due diligence, utility and connectivity strategy, master planning and design assurance through PMO and delivery assurance, commissioning and operational readiness. By identifying technical, authority, programme and interface risks early, we help clients make informed decisions before those risks become expensive changes during delivery.

Every engagement is director-led. Clients work directly with the senior team responsible for the agreed advice and deliverables, with continuity through the appointed project stages.

01

Independent advice

Vendor-neutral recommendations aligned to the investor’s technical, commercial and risk objectives.

02

Senior-led delivery

Direct leadership by experienced data centre, engineering, project and commercial directors.

03

Vietnam intelligence

Practical experience with EVN, PCCC, local design approvals, contractors and provincial stakeholders.

04

Investor-grade outputs

Clear briefs, risk registers, programmes and technical reports structured for decisions and due diligence.

What we do

One accountable partner across the development lifecycle.

Engage one service module or combine them into an integrated programme from first investment question through operational handover.

01

Market entry & investor advisory

Location screening, investment model review, utility benchmarking, partner mapping and early risk definition.

  • Go / no-go strategy
  • Province and industrial park comparison
  • Initial programme and development route

02

Site due diligence & pre-development

Technical evaluation before land commitment or major capital deployment.

  • Power, water, fibre and access
  • Flood, drainage and geotechnical coordination
  • Pre-feasibility and risk reporting

03

Master planning & design assurance

Capacity, resilience and phasing translated into a coordinated mission-critical design basis.

  • OPR, BOD and design brief
  • MEPF and BIM coordination
  • Tier, maintainability and SPOF review

04

Utility & connectivity strategy

Realistic routes to energisation, cooling water security and carrier-neutral connectivity.

  • EVN and HV/MV interface
  • Substation and long-lead strategy
  • Fibre diversity and MMR planning

05

PMO & Delivery Assurance

Director-led project management office (PMO) support covering programme, cost, risk, change and reporting controls, with coordination across designers, utilities, contractors and operators.

  • Governance, programme integration and investor reporting
  • Cost, risk and change controls
  • Delivery assurance and interface coordination

Construction management and site supervision can be included under a separately defined scope.

06

Commissioning & operational readiness

Evidence-based completion—from FAT and SAT through integrated systems testing and operator handover.

  • Level 1–5 commissioning governance
  • Deficiency and close-out control
  • SOP/EOP/MOP and FM onboarding
Master plan rendering of a large data centre campus Illustrative concept

Featured project

500 MW utility-load hyperscale & AI data centre park

South Vietnam · Feasibility, master planning and pre-concept design

A planned, phased development with a 500 MW utility-load planning basis. ENGCORP’s appointment covers data centre feasibility, technical master planning and pre-concept advice for the DC plots, including requirements and interfaces with the park’s infrastructure consultants.

220/110 kVProposed grid interface
8 plotsPhased operator onboarding
A/B routesProposed fibre diversity
ResilienceOperator-specific design targets
  • DC plot requirements for power, water, fibre and authority interfaces
  • Dual MMR and carrier-neutral connectivity concepts
  • Cooling-water, desalination and resilience concepts
  • BESS and renewable-energy integration advice

Planning targets are subject to utility and carrier confirmation, approvals and operator design. Grid voltage does not establish supply independence. Tier certification, where required, applies to the assessed facility and design. Park infrastructure design and delivery remain with the appointed parties.

Selected experience

Selected data centre and infrastructure experience.

Selected ENGCORP and leadership assignments across APAC and Europe, including work undertaken with previous employers. Roles refer to the assignment experience and do not imply that ENGCORP held every appointment. The planned 500 MW campus is shown separately.

On smaller screens, scroll the table sideways to see all columns.

ProjectTypeReported project capacity*LocationScope
Orange MSC SwitchMSC / data centre10 MWBangkokDesign & project management
Orange MSC 2 Switch — MTTMSC / data centre10 MWBangkokDesign & project management
TRUE IDC DC1Colocation15 MWBangkokDesign & project management
TRUE IDC DC2Colocation12 MWBangkokDesign & project management
TRUE TT2 Power PlantPower infrastructure20 MW plantBangkokDesign & project management
TIDC 7GCloud / telecom16 MWBangkokDesign & project management
Telecity ColocationColocation12 MWGermanyLeadership experience · project management & delivery
Telecity ColocationColocation15 MWSwedenLeadership experience · project management & delivery
Cable & Wireless Roll-OutColocation programmeVariousUnited KingdomProject management & delivery
Global Switch — UpgradesColocationVariousUnited KingdomProject management & delivery
VINADATA (VNG)Online services4 MWVietnamDesign & project management
Sacombank Core Banking DCCore banking5 MWVietnamDesign & project management
VNG Data CenterColocation6 MWVietnamDesign & project management

*Figures describe individual project references. IT load, total facility load and generation capacity are different measures and are not aggregated. Capacity basis, dates, contracting entity and specific personnel involvement can be discussed during qualification, subject to confidentiality.

Technical depth

Integrated engineering for resilient, efficient facilities.

Our design and assurance work coordinates the systems that determine capacity, availability, maintainability and whole-life performance.

Data centre electrical switchgear installation
Power systems

Utility, HV/MV, UPS, generation and BESS

Data centre mechanical cooling plant
Cooling systems

Chiller plants, liquid cooling and PUE optimisation

Data centre fire suppression cylinders
Fire & life safety

PCCC pathway, TCVN, NFPA and FM alignment

Isometric BIM model of an 18 kW data hall layout
BIM & coordination

Buildability, clash detection and interface control

Data centre standby generator and electrical control equipment
Standby generation

Reliable standby power

High-voltage transmission lines supporting grid-connected power
Utility infrastructure

Grid-connected power

High-density fibre-optic cabling forming the data centre connectivity backbone
Connectivity

Data highway

Solar photovoltaic panels and wind turbines supplying renewable energy
Clean power strategy

Renewable energy

Battery energy storage system integrated with solar, wind and grid infrastructure
Energy resilience

Energy storage systems

Data centre water connection, storage and distribution systems
Water strategy

Sensible water usage

Design and assurance interface:

TIA-942 · Uptime Institute Tier III/IV · ISO/IEC 22237 · ASHRAE · IEC · NFPA · FM Global · TCVN/QCVN · LEED/VGBC

Leadership team

The directors who win the work stay accountable for delivery.

A compact senior team supported by licensed local engineers and specialist consultants selected to suit each project.

Peter Nicolson

Peter Nicolson

General Director & Team Director

35+ years across construction and mission-critical delivery in Europe and APAC, including two decades focused on data centres.

Tran Quoc Sang

Tran Quoc Sang

Project Director

20 years spanning feasibility, MEPF design, project management, testing and commissioning across Vietnam and Southeast Asia.

Prasong Saengsutha

Prasong Saengsutha

Design Director

28+ years in EHV, HV, MV and LV systems, protection engineering and data centre design and delivery in Thailand.

Nguyen Long

Nguyen Long

Cost Director

24+ years in quantity surveying, cost planning, procurement and commercial assurance across complex developments.

Wider ENGCORP capability

Engineering and PMC services beyond data centres.

Alongside our mission-critical work, Engineering Corporation International supports clients across commercial, industrial, education, hospitality, government, logistics, residential and mixed-use developments in Vietnam and international markets.

01

Project & Construction Management (PMC)

Independent client representation from feasibility and project strategy through design coordination, construction control, commissioning and handover.

  • Programme, reporting and project controls
  • Consultant and contractor coordination
  • Quality, safety, budget and variation oversight
02

Integrated engineering design

Coordinated engineering solutions developed for performance, compliance, maintainability and practical construction delivery.

  • Electrical and power distribution
  • HVAC, hydraulics, plumbing and fire protection
  • Structural design and analysis
03

BIM & digital coordination

Multidisciplinary modelling that improves design integration, identifies clashes early and supports clearer construction documentation.

  • 3D multidisciplinary BIM models
  • Coordination and clash detection
  • Design documentation and constructability review
04

Cost & commercial management

Disciplined commercial controls that protect the client’s budget and provide visibility of forecast cost and financial exposure.

  • Budget estimates and elemental cost plans
  • Change control and cost-to-completion forecasting
  • Payment review and final-account support
05

Procurement & contract management

Procurement planning and contract administration structured around the project’s delivery strategy, risk profile and programme.

  • Procurement strategy and tender documentation
  • Prequalification, evaluation and appointment
  • Contract compliance and commercial administration
06

Risk, quality & stakeholder control

Structured management of technical, authority, programme and delivery risks across complex multi-party projects.

  • Risk registers and mitigation tracking
  • Authority and stakeholder coordination
  • Quality assurance and transparent reporting
Sectors

Education · Hospitality & resorts · Commercial & corporate · Industrial & logistics · Government & secure facilities · Residential & mixed use

Representative experience

RMIT University · Fulbright University · CP Group Vietnam HQ · Fusion Hotel Saigon Centre · Ortholite factories · Australian Consulate and United Nations facilities

Selected clients & project partners

Selected organisations represented in ENGCORP’s wider project experience.

VinaCapital
VinaGame
Orange
Indochina Capital
Ortholite
United Nations
Trang Tien Plaza
Lodgis
Fusion
Fulbright University Vietnam
CP Group
RMIT University
GHD
DHL
Australian Consulate-General, Ho Chi Minh City
True IDC

How we engage

Start at the stage that matches your investment decision.

Each module has a defined purpose and deliverable set. Modules can stand alone or form a continuous programme.

Vietnam regulatory pathway

Key approvals and project actions.

A practical high-level map of the principal legal frameworks that shape data centre development in Vietnam.

AreaPrimary legal framework
Investment / entityInvestment Law 143/2025/QH15 (effective 1 March 2026); enterprise-registration rules
Land and planningLand Law 31/2024/QH15 (general commencement 1 August 2024 under Law 43/2024/QH15, subject to specified exceptions); national, provincial, urban/rural and industrial-zone plans
ConstructionConstruction Law 135/2025/QH15 (effective 1 July 2026) and implementing regulations
Fire and rescueLaw 55/2024/QH15 (effective 1 July 2025); QCVN 06:2022/BXD and Amendment 1:2023; implementing rules
EnvironmentEnvironmental Protection Law 72/2020/QH14; Decree 08/2022 as amended
ElectricityElectricity Law 61/2024/QH15; adjusted PDP8; grid and market rules
Renewable procurementDecree 57/2025/NĐ-CP on the direct power purchase mechanism
Telecom / data centreTelecommunications Law 24/2023/QH15; Decree 163/2024/NĐ-CP
Data governanceData Law 60/2024/QH15 (effective 1 July 2025)

Land Law commencement checked 16 October 2026 against Law 43/2024/QH15 and the Government commencement notice. High-level planning summary only. Applicable laws, decrees, technical regulations, authority interpretations and transitional provisions must be confirmed for the project location, ownership structure, service model and submission date.

Discuss your project

Need an independent technical partner on the ground in Vietnam?

Tell us where the project is, its capacity basis, its current stage and the decision you need to make. We will discuss a focused scope and practical next steps.

Email Peter Nicolson

Opens your email app with a draft for you to send. This form does not submit or store your enquiry.

View / print company overview

For more information, click here to visit our ENGCORP profile.

ENGCORP International Ltd

3rd Floor, GIC Building
228B Bạch Đằng, Ward 24
Binh Thanh District, Ho Chi Minh City, Vietnam

Tran Quoc Sang
+84 983 217 537
sang.qt@engcorp-international.com
QR code for ENGCORP contact information
Scan for ENGCORP information